Previous Projects


Creating knowledge in human centered approaches to technology and in digital worlds for humans in society

IstarLogo-small.png

Projects

At this stage, projects mentioned here are projects carried out by ISTAR-IUL members, mostly as PI's, in the context of their former units.

On going projects

  1. 2011-2014 QREN CNG (Conteúdos de Nova Geração) Part of the team from ISTAR: Miguel Dias (PI).
  2. 2011-2014 FP7 IST Timbus, Resilient business processes, Part of the research team from ISTAR: Paulo Trezentos (Local Coordinator)
  3. 2011-2015 QREN 13852 AAL4ALL (Ambient Assisted Living for All)” (www.all4all.org) project co-funded by COMPETE under FEDER via QREN Programme, Project 13852 QREN. Part of the team from ISTAR: Sara Eloy, Henrique O’Neill (PI) and Carlos Serrão.
  4. 2012-2014 FP7 Étoile Cascades Ideas - Enhanced Technology for Open Intelligent Learning Environments: Complex Adaptive Systems for Creating And Distributing Education and Scientific Ideas – http://www.etoilecascadesideas.eu/, FP7 CA, funding 110.000€ for ISTAR team.
  5. 2012-2014 FP7 NESS - Non-Equilibrium Social Science - http://nessnetwork.eu (2012-14), FP7 CA, funding 110.000€ for the ISTAR team.
  6. 2012-2014 FP7 IST Prose Coordination Action, Part of the research team from ISTAR: Paulo Trezentos (Coordinator)
  7. 2013-2104 PME RD&T Incentive System – Lighthouse, LISBOA-01-0202-FEDER-024890, Part of the research team from ISTAR : Carlos Serrão.
  8. 2013-2015 EC-ERASMUS OIKOnet - A global multidisciplinary network on housing research and learning. Project reference: 539369-LLP-1-ES-ERASMUS-ENW. Lifelong Learning Programme. Coordination: Leandro Madrazo (La Salle University of Architecture, Barcelona, 2013 a 2015). Part of the research team from ISTAR (PI): Alexandra Paio.
  9. 2013-2019 UNESCO Complex Systems Digital Campus – UNESCO UniTwin Network - http://unitwin-cs.org, including more than 80 universities; the ISTAR team coordinates the Portuguese speaking institutions.

Finished projects

  1. 2008-2010 FCT MASONGROUT - Grouts in the consolidation of old masonries - PTDC/ECM/72705/2006) coordination: Prof. Doutor Fernando M. A. Henriques (DEC-FCT/UNL, 2008 a 2010). Part of the research team from ISTAR: Vasco Rato (PI)
  2. 2009-2012 FP7 ASSYST - Action for the Science of Complex Systems and Socially Intelligent ICT, Grant agreement no: 231710 Call identifier: FP7-ICT-2007-3, Objective: ICT-2007.8.4, funding 120.000€ for the FFCUL team. Part of the research team from ISTAR: Jorge Louçã (PI)
  3. 2010-2012 QREN 5508 VBE Security2010-VISION BOX. 74.257,70 €. Subcontrated. 100% funded. Part of the research team from ISTAR: Miguel Dias (PI)
  4. 2010-2013 FCT ARIA PTDC/EIA-EIA/105305/2008, 2010/2012 - Assisted Reading Environments for Ageing Users, Part of the research team from ISTAR: Nuno Guimarães (PI)
  5. 2010-2013 FCT Os Gabinetes Coloniais de Urbanização: Cultura e Prática Arquitetónica, (PTDC/AUR-AQI/104964/2008), project funded by FCT, coordination: Ana Vaz Milheiro (DAU / ISCTE - IUL, 2010 a 2013). Part of the research team from ISTAR: Vasco Rato (PI)
  6. 2011-2013 FCT RAPS PTDC/EIA-EIA/113660/200 Reading Analysis with neurophysiological Signals - Part of the research team from ISTAR: Nuno Guimarães (PI)
  7. 1998-2009 ALFA SENSO South-American and European Network for Software, École des Mines de Nantes (Jacques Noyé), Part of the research team from ISTAR: Fernando Brito e Abreu (Coordinator)
  8. 2006-2008 CYTED/UNESCO COMPETISOFT, Mejora de Procesos para Fomentar la Competitividad de la Pequeña y Mediana Industria del Software de Iberoamérica
(CYTED: 3789, UNESCO: 120311), UCLM (Mario Piattini), Part of the research team from ISTAR : Fernando Brito e Abreu
  9. 2009-2011 [Sinfic – Industrial, Private] IPDMS, Integrated Process Design and Management System, FCT/UNL (Fernando Brito e Abreu) e SINFIC, Part of the research team from ISTAR : Fernando Brito e Abreu (PI)
  10. 2011-2013 FP7 IST, ULOOP, user-centric open-source software and a large-scale realistic demonstrator, Part of the research team from ISTAR : Paulo Trezentos.

Other Initiatives and Results

  1. 2006-2008: Design, specification, development, test and deployment of the HW/SW supporting the Cave-Hollowspace of Lousal, and development and installation of the Serious Game: “Visita à Mina Virtual” for the Cave-Hollowspace of Lousal.
  2. 2013 Three international exhibitions occurring in parallel in the scope of the Lisbon Architecture Triennale 2013, 30th September to 4th October, Lisbon. http://www.trienaldelisboa.com/pt/ http://www.close-closer.com/en/#/contact
  3. 2013 STTF2013 - Sustainable Technologies and Transdisciplinary Futures: From Collaborative Design to Digital Fabrication, 2013 (Summer School), promovido por ISCTE-IUL | Vitruviusfablab | CIES-IUL. Duração: 1 semana. Local: ISCTE-IUL, Lisboa, Organização:Nascimento, Susana; PAIO, Alexandra C. R; Rato, Vasco M; Guimarães, Nuno; Pólvora, Alexandre</p>
  4. 2013 Workshop “Re-inventing ceramic tiles: Using shape grammars as generative method for pattern design”. Tutores: Sara Eloy (ISCTE-IUL), Deborah Benrós (UCL) e José Duarte (FAUTL), ministrado na conferência Future Traditions, 1st International regional meeting do eCAADE. 4 Abril 2013, FAUP, Porto. Sponsored by Sonae Indústria.